BP SCAFFOLDING SERVICES

Access scaffolding erected, hired and dismantled — tagged, inspected and off your site the day you're finished with it.

  • Erect & dismantle
  • Weekly hire
  • Inspections

What we take on

Ask for it by name — these are the jobs that go in the diary most weeks.

Most asked for

Access scaffold — erection

Independents, birdcages, towers and lift shafts, set out to the elevations and the loads you'll actually be putting on them.

  • Set out to load class and lift heights
  • Boarded, braced, tied and ladder access
  • Toe boards, guard rails and brick guards
  • Handover tag before anyone climbs on

Scaffold hire

The frame stays up for the length of the job, and the hire runs on if the programme slips — just tell us.

  • Hire by the week after the first period
  • Alterations as the trades move up
  • Replacement boards and fittings
  • Extensions agreed before they're built

Temporary roof & sheeting

Keeps the weather out of an open roof so the carpenters keep working through a wet week.

  • Beamed temporary roof over the pitch
  • Shrink-wrap or monarflex sheeting
  • Debris netting where it's needed
  • Designed for wind loading on the frame

Inspections & reports

Statutory checks on scaffolds in use, including frames another firm put up.

  • Inspection at seven-day intervals
  • Check after high winds or an alteration
  • Written report for your site file
  • Tag updated on the frame

Dismantle & strike

Down in lifts, loaded out, and the ground swept so you're not picking fittings out of the grass.

  • Booked in when you give us the date
  • Lowered, not dropped
  • Gear loaded and taken away same visit
  • Ties made good on the elevation

Every job is quoted off the elevations, the loads you'll be putting on it and how long you need it standing.

How we work

Built to a design, not to a guess

Anything outside a standard configuration gets drawn and calculated before a tube comes off the lorry — load class, tie pattern, bay lengths, the lot.

Tagged and handed over

Nobody steps on it until the handover tag is on the access point and the paperwork is with your site manager.

Checked every seven days

Scaffolds in use get inspected at seven-day intervals, after alterations and after a blow, with a written report for your file.

Altered as the job moves

Roofers want it higher, the renderers want the boards off — ring us and we come back and change it rather than leaving you to climb round it.

Pavements and public footways

Where the frame goes over a footway we sort the licence with the council and build it with a boarded gantry so people can walk under it.

Site left clean

When we strike it, the gear goes on the lorry the same visit and the ground gets swept. No stack of boards waiting three weeks for collection.

What the trade says

★★★★★
Rang on the Thursday, frame was up and tagged before the roofers arrived Monday. Loading bay where I asked for it, not where it was easiest.
Darren
★★★★★
Full re-roof on our house and the temporary roof meant the rain never got in. They took it down the day after the scaffold was finished with and swept up after themselves.
Pauline
★★★★☆
Used them on three sites now. Inspection reports always turn up for the file, which saves me chasing. Needed an extra lift mid-job and they came back the next morning.
Mo

Straight answers

Do you come and look before you quote?

Yes. We'd rather stand in front of the building than price off a photo — we need to see the ground, the ties, the access for the lorry and what's going up on the boards.

Who sorts the licence if it's over the pavement?

We do. If the frame sits on a public footway or the highway it needs a licence from the council, and we apply for it and build it to their conditions, including a boarded gantry where people need to walk under.

How often does a scaffold have to be inspected?

A scaffold in use is inspected at intervals of no more than seven days, and again after any alteration or after weather that could have affected it. We do those checks and leave a written report for your site file.

What if the job overruns?

Tell us and the hire carries on by the week. Nothing comes down until you give us the strike date.

Can you alter it once the trades are on it?

Yes — extra lift, boards out for rendering, a hop-up for the guttering. Ring us and we'll come back and change it. Nobody on site should be unbolting our gear themselves.

Will you work on a domestic house, not just a site?

Plenty of what we do is houses: chimney stacks, re-roofs, rendering, window replacements, gable repairs. Same frame, same tags, same inspections.

Tell us about the job

Name, email and a line about what needs scaffolding — we'll take it from there.

  • A scaffolder reads it, not a call centre
  • We come and look at the building before we price
  • You get the quote in writing, with the hire period on it